Working to install the Gun Barrel Stabilization (GBS) board from Clark in conjunction with the TK60G2 and I have hit a BIG Roadblock! The GBS must be mounted in the turret level with respect to the hull, that is the easy part. The kicker is that the connection between the GBS and the TK cannot exceed 80mm in length. I had planned on running the path through the existing slip ring but the wire length would be 4.5 – 5”.

So, to meet the 80mm requirement I must move the TK to the turret. That means running the Battery and the Motor leads into the turret. To maintain 360-degree turret rotation I must run those leads through a Slip Ring. A slip ring capable of carrying the “potential” current (10A) is 1.5” in Dia. and nearly 3” in length. The available Slip Ring only has the needed number of wires for the Battery and Motors (3 two wire circuits).

I "think" I can make room for the Slip Ring, I then must move the Receiver into the turret as well. I will then have to provide wire paths for the Turret Rotation Servo, Speaker and Lighting into the lower hull. I cannot use two slip rings so; I may have to either give up 360 rotation which kind of defeats the purpose of the GBS and the Main Gun Deck Lift feature. OH NO!

Hoping someone might have a thought.
TIA Barry