Hi,
I determined the next best step is to install the upper hull on the chassis to get a clear view of the base. Then I will scratch build the floor and position the gun according to blue prints.
As you can see, the hull was installed and the M4A4 style rear deck was sanded and a replacement plasticard layer closer to the M7 mid production will be build on top. The whole thing will undergo major surgery, specially at the rear end. I need to go to a hobby store to replenish my plasticard reserve, the Nashorn build of last spring depleted it completely.

- M7 priest rear deck prior to new construction
In the meantime, I received the Shapeways parts that I ordered from shapeways.com. They are real nice. The discount coupon GREETINGS15 gave me 15% off on my order.
These are the M7 Priest gun parts: contain sighting apparatus for both sides of the gun that I was looking for because they are not provided with the Vandra kit, plus other fine parts that I will probably use as replacements. Those sights would take hours to scratch build.

- M7 Priest gun parts

- M7 Priest gun parts
These are parts to convert the Heng Long Sherman M4 bogies into early M3 type that fits the M7 early and mid production. I do not know how they will end up once installed but they are intriguing, well made, functional and solid. I wish I had seen these before my M3 Lee build. They provide the only kit option available that I know of to have M3 suspension. The upper part of the HL M4 bogies need to be cut above the screw hole and replaced by these plugs, 6 are provided. The M4 roller will be re-used. I have great expectations for these. We'll see.

- M3 early bogies

- M3 early bogies
These are early Spoked M4 road wheels, 12 are provided. They really look great. These would be useful on many Sherman types. But spoked idlers are not provided and do not seem to be available.

- Spoked M4 roadwheel
These are 105mm shell containers. 10 are provided per set. I may order more.

- 105mm shell containers
Regards,
Louis