Here's the look I'm working towards.

Two weeks worth of work.

Overall view of right side, 17 retainers per side.


The one on the right is complete except the Retaining Chain and Washers under bolt heads. The one on the left has the Washers.



Not counting the washers or retainer pin there were 1086 individual steps (cutting, shaping/filing, drilling and soldering) accomplished to make the 34 retainers. That is what I have been doing for the last two weeks.
You know where you get 1” 1/16 scale washers; you make them! That’s a total of 68 washers punched from .007” brass sheet annealed to dead soft. Then require a #76 hole in the center of the washers to accept the simulated bolt stem.

Thanks for looking in!
Barry