Page 1 of 1

Walker Bulldog tracks

Posted: Mon Jun 22, 2020 11:43 pm
by Steve.d.scott
Does anyone who has a metalled track henglong Bulldog know how many tracks links it should have. Discovered today that one side of mine had 71 the other 72. 71 side is a tight track 72 is fairly slack.

Re: Walker Bulldog tracks

Posted: Tue Jun 23, 2020 11:40 am
by General Jumbo01
I can't help you with the numbers but which side do you prefer, the slacker tighter side? Does one run better or look more correct? If you favour the tighter side remove a link from the 72. If you prefer the slacker side, add a link to the 71. That's what l would do.

Re: Walker Bulldog tracks

Posted: Tue Jun 23, 2020 1:59 pm
by Steve.d.scott
General Jumbo01 wrote:I can't help you with the numbers but which side do you prefer, the slacker tighter side? Does one run better or look more correct? If you favour the tighter side remove a link from the 72. If you prefer the slacker side, add a link to the 71. That's what l would do.
Thanks . I like the tracks to look fairly tight. Currently running both sides on 71 and the tank move good.

Re: Walker Bulldog tracks

Posted: Sat Jun 27, 2020 12:45 am
by Afrikakorps
Hi Steve,
just saw your question and happened to reworking on my M41, good timing :D
A quick check on one side of mine counts 73 links, and you can see from my pic that the tension seems right. :thumbup:
Cheers
Afrikakorps
Clark Tk40
Clark Tk40