My T90 so far!!!
Posted: Sun Oct 02, 2016 2:24 pm
Hi All,
Just a few pics of my T90A so far. So upgrades fitted so far is Metal Road-wheel set metal sprockets and idlers and track return/support rollers all the wheels have two bearings per wheel. Going to leave the plastic tracks on for the moment they seam to be quite robust being double pin!! Time will tell. As you can see done a lot of work on the hatches I think they look ok!!. Also made the commanders calpolar rotating The instructions say to use 10mm dowel for the unditching log.To small I used 12mm much better it looks right. I've got the two jamming units to work side to side and up and down so now got to work out how to link them to the mantle to work with the barrel. Here's a few pics so far. Brian...
Just a few pics of my T90A so far. So upgrades fitted so far is Metal Road-wheel set metal sprockets and idlers and track return/support rollers all the wheels have two bearings per wheel. Going to leave the plastic tracks on for the moment they seam to be quite robust being double pin!! Time will tell. As you can see done a lot of work on the hatches I think they look ok!!. Also made the commanders calpolar rotating The instructions say to use 10mm dowel for the unditching log.To small I used 12mm much better it looks right. I've got the two jamming units to work side to side and up and down so now got to work out how to link them to the mantle to work with the barrel. Here's a few pics so far. Brian...