M1A1 Thunder Run: Finishing Turret Upgrades
Posted: Wed Dec 23, 2015 6:04 pm
Thanks to the wonderful builds that I've seen, and the advice I've received since joining this forum, I'm inspired to share my build log of the Heng Long Abrams M1A2. I received the basic kit with zinc motors, and purchased the following (so far):
--metal tracks with rubber pads
--metal idlers with support bar
--metal sprockets
--metal support arms and springs
--Ultimate Edition II gearbox/motors
--360 degree slipring
I've also ordered the Tamiya Pershing sprue with the 0.50 cal machine gun, since it's much nicer than the HL version. I will be attempting to replace some of the more obvious molded-on features, and backdate the M1A2 to an M1A1, 3rd Infantry Division, OIF 2003.
Hope you like it! Cheers, Tom


I drilled holes in the metal sprockets:


Replacing some surface details (I'm starting at the front and working my way back, more or less, and will be attaching some parts after adding the anti-slip):


Casting numbers added using numbers shaved off sprues:

--metal tracks with rubber pads
--metal idlers with support bar
--metal sprockets
--metal support arms and springs
--Ultimate Edition II gearbox/motors
--360 degree slipring
I've also ordered the Tamiya Pershing sprue with the 0.50 cal machine gun, since it's much nicer than the HL version. I will be attempting to replace some of the more obvious molded-on features, and backdate the M1A2 to an M1A1, 3rd Infantry Division, OIF 2003.
Hope you like it! Cheers, Tom


I drilled holes in the metal sprockets:


Replacing some surface details (I'm starting at the front and working my way back, more or less, and will be attaching some parts after adding the anti-slip):


Casting numbers added using numbers shaved off sprues: