Page 1 of 8
Three Tigers
Posted: Mon Jul 08, 2013 5:24 pm
by Edwin
Hello,
today has been running all day and by the way my router so I can start soon with the bonding of three new Tiger tanks. This will allesammt equipped with brushless motors and real inertia and two of them I will also build completely.

- k-IMG_3670.JPG (45.75 KiB) Viewed 3209 times

- k-IMG_3730.JPG (29.21 KiB) Viewed 3209 times
Re: Three Tigers
Posted: Mon Jul 08, 2013 9:10 pm
by Dietrich
Hi Edwin,I am looking forward to seeing one of these Tigers finished and actually moving around with your 'Momentum System' in place

Re: Three Tigers
Posted: Fri Jul 12, 2013 6:33 pm
by Edwin
And also in the three tigers it goes on.
But currently I am working first so that a whole lot of free stuff for the drive of three tigers and a panther, as an aside to make the moves along.
First, I have a whole handful of collars with double clamping and a few made ??with Simple.
And then today, the axle for four tubs.

Re: Three Tigers
Posted: Sun Jul 14, 2013 5:25 pm
by Edwin
Slowly, I can now start with the stick of the three tigers.
The first step is as always to stick with the other arm bearing retainer.
For this, I must first deburring the aluminum strips, rub the holes, sand and degrease.

- k-IMG_3745.JPG (38.42 KiB) Viewed 3122 times
Then I can put the stock into the appropriate holes with some glue and place it on a flat surface and complain.

- k-IMG_3746.JPG (34.04 KiB) Viewed 3122 times
But in order to glue the tubs I still need the supports of the chain tensioner. For this I turn off an aluminum rod to 25mm diameter.

- k-IMG_3747.JPG (39.99 KiB) Viewed 3122 times
After I cut 8 pieces for 4 trays, they were turned on on both sides of a 2mm paragraph.

- k-IMG_3748.JPG (27.03 KiB) Viewed 3122 times

- k-IMG_3749.JPG (55.07 KiB) Viewed 3122 times
After I made in the middle of a 6mm hole for the Exenterachse missing the lock. I'm doing this as I drill a 3.2 mm hole in the side of the M4 I cut a Gweinde. Thus, all the mounting brackets are then completed after repeated rubbing of the center hole.

- k-IMG_3750.JPG (42.71 KiB) Viewed 3122 times

- k-IMG_3751.JPG (27.83 KiB) Viewed 3122 times
Re: Three Tigers
Posted: Mon Jul 15, 2013 6:33 pm
by Edwin
And already I can stick with the start of the first well.
First, of course, the parts deburring, sand, degreasing and dry adjust.

- k-IMG_3754.JPG (34.39 KiB) Viewed 3101 times
The Simple tile adhesive should then take on an absolutely flat surface. I use this a nice heavy, flat-ground granite slab.
So now, the first pan harden and tomorrow I can start the next one.

- k-IMG_3755.JPG (37.43 KiB) Viewed 3101 times
Re: Three Tigers
Posted: Wed Jul 17, 2013 3:55 pm
by Edwin
It also goes further back.
I'm currently on bonding and this takes time.
Here I draw on the second well just adjusting rod out. These ensure that the drive later really is straight and everything fits zueienander. Since the bonding adhesive also like to come to the rods can be often not pull it out easily. So I turn it out with a powerful cordless screwdriver and then it goes easily.

- k-IMG_3756.JPG (36.72 KiB) Viewed 3074 times

- k-IMG_3757.JPG (31.03 KiB) Viewed 3074 times
Then today the third well was to stick to the series.

- k-IMG_3758.JPG (40.42 KiB) Viewed 3074 times
Now with the first well I could start with the chain covers. This can be adapted abraded and degreased again.

- k-IMG_3762.JPG (36.35 KiB) Viewed 3074 times
So I can then glue the covers piece by piece and align it with the tub.

- k-IMG_3763.JPG (39.68 KiB) Viewed 3074 times
Nice and slow, it looks to me like again at Henschel in the assembly hall of ......

- k-IMG_3764.JPG (45.55 KiB) Viewed 3074 times
Re: Three Tigers
Posted: Fri Jul 19, 2013 3:52 pm
by Edwin
And further you go.
I also have a little re-employed me next to sticking with the small stuff and made ??the first bearing side of the axes for the three tigers and also the same for a panther, as many parts without adjustments to fit my machine.
64 times 6mm silver steel cut to length.

- k-IMG_3786.JPG (42.14 KiB) Viewed 3049 times
The twisted one end.

- k-IMG_3787.JPG (45.64 KiB) Viewed 3049 times
Brought to the correct length and drilled.

- k-IMG_3788.JPG (38.24 KiB) Viewed 3049 times
And so now there are 64 pieces in stock ready in the 64 times now I must solder a 3mm rod.

- k-IMG_3789.JPG (34.25 KiB) Viewed 3049 times
Yes of course and gluing went well.
In the third Tigers bath today were the chain covers on the series and the Panther I also razed it.

- k-IMG_3790.JPG (42.04 KiB) Viewed 3049 times
Re: Three Tigers
Posted: Sat Jul 20, 2013 6:09 pm
by Edwin
Dirty work ......
Today, first the plaster of pans was announced and this is a dusty business and I do not for the last time
So today I sanded all external panel joints to angle and adhesive tabs removed.

- k-IMG_3809.JPG (56.42 KiB) Viewed 3032 times
Then it went a little further with gluing. The reinforcements of the chain covers had yet to be installed.

- k-IMG_3817.JPG (39.02 KiB) Viewed 3032 times

- k-IMG_3818.JPG (32.8 KiB) Viewed 3032 times
Were then again the axes in line. Since I now had to solder all 64 pieces.

- k-IMG_3791.JPG (41.42 KiB) Viewed 3032 times

- k-IMG_3811.JPG (43.11 KiB) Viewed 3032 times
After soldering I could clamped first using the lathe tool tip align in the lathe and then turn off the excess solder and then work with the blue rubber polishing wheel.

- k-IMG_3812.JPG (38.74 KiB) Viewed 3032 times

- k-IMG_3813.JPG (28.25 KiB) Viewed 3032 times
The first set of axes for the Panthers is now ready.

- k-IMG_3814.JPG (39.57 KiB) Viewed 3032 times
By the way, my router is running again and it came out everything the housing of the countershaft.

- k-IMG_3808.JPG (39.57 KiB) Viewed 3032 times
Re: Three Tigers
Posted: Sun Jul 21, 2013 6:33 pm
by Edwin
Today, the thrust bearing of the axes of the series were.
I've turned from brass.

- k-IMG_3834.JPG (35.11 KiB) Viewed 3025 times
The axes are all polished and I need them to align the thrust bearing in the tubs.

- k-IMG_3821.JPG (48.32 KiB) Viewed 3025 times

- k-IMG_3835.JPG (36.33 KiB) Viewed 3025 times
So I could glue the parts in all three Tiger tanks and the Panther tank.

- k-IMG_3836.JPG (42.66 KiB) Viewed 3025 times
And by the way are also the cheeks fallen out of gear milling machine.

- k-IMG_3819.JPG (37.33 KiB) Viewed 3025 times
Re: Three Tigers
Posted: Thu Jul 25, 2013 2:03 am
by lliw180
wow thats a lot of work looking good mate