As always Mr Painless your words are greatly appreciated
I started working on the turret this evening. I will have to construct some quick connect fittings made of pieces of carefully cut styrene for the turret roof to be removed to allow for access to the servos for elevation recoil and turret rotation
I temporarily installed the metal gun barrel that came with the kit for reference purposes only.
I very very carefully drilled out the machine guns by cutting them in half to allow for a 1mm drill bit to get through both tubes for the led fiber optics. Very tedious work. Drilled from the end of the machine gun barrel towards the middle cut and then from the middle cut to the end of the gun at the hull
The hull mounts I made work great and keep both halves of these hull firmly in place.
I then decided while I had the 1mm drill bit out and handy I'd try my hand at drilling out the needed holes for each track link.....
Success! So far each sprue has 6 track links so I keep them on the plastic frame and carefully drill each track link from each side with the bit. Crazy crazy.
I so far for the day drilled out 60 track links successfuly and I'm done until tomorrow



