hello chaps!
here you are some more pictures, the progress from two more days of work
filling the space between the main road's support walls with compacted ground, and on the right of the pic, excavating to free space to build the retaining wall for the train's tracks (if we ever build them) and also the entry for the port.
after building the first part of the harbour's entry and the whole retaining wall.
Between the wall an the river we will build a 'camí de ronda', as we say in catalan, i think you can translate this for something like 'patrol/watch path'. On the opposite side of the lake it will cross, with a wooden bridge, a rocky ravine from where we will fill the river with water from the well (this concrete thing you see at the background of the pic)... although I doubt that nobody will dare to circulate through it, with the free fall to more than 25cm of deep water that will be just below
installing the inverted tiles that will form the main road, these are leftovers from part of my house 'sgarden, i have some 70 of them so we can build some 28m of concrete road, the rests of roads will be made of compacted & sifted ground, mixed with a polymeric product that is used to build roads without asphalt. So it will become rock solid.
and from the upper part of the well, from this view here you can 'guess' where the walkway will run, to the right of the long concrete wall
that's all for now guys
thanks for watching