Page 3 of 13
Re: Timbered House under construction
Posted: Thu Sep 18, 2014 5:58 pm
by hotte8487
As next was the railing on the agenda, once again tinker parts, at least the foot and handrail. For the balusters I used skewers; here's a photo with the wrong scale for the railing - fitting.
Then in the right scale completed the railing rod for rod. In the front area, because where the two clamps sit, is the handrail for the coiled area already mounted.
For today's report end once a few views with inserted stairs.
A bit grinding is still missing, but so it goes already for me.
Re: Timbered House under construction
Posted: Thu Sep 18, 2014 7:20 pm
by ALPHA
DANG

handrails and everything...I hope your plan is to have some of the roof blown off... so the interior can be taken in.... awesome work Tricky
ALPHA
Re: Timbered House under construction
Posted: Fri Sep 19, 2014 5:57 am
by hotte8487
ALPHA wrote:DANG

handrails and everything...I hope your plan is to have some of the roof blown off... so the interior can be taken in.... awesome work Tricky
ALPHA
Hi Alpha,
exactly so is the plan - stay curious
Re: Timbered House under construction
Posted: Tue Sep 23, 2014 4:16 pm
by hotte8487
The framework for the construction of the floor in the upstairs hallway is still open, therewith I'll start today.
Here are the parts already sawed, notched and once loosely put together.
Subsequently then the assembly, simultaneously with the two thick middle rafters; the stairs loosely with in between.
Then the two remaining thick ceiling beams and the corresponding rafters were sawn and mounted. In the interstices 50% I've used slimmer ceiling beams (10 x 5 mm) and rafters.
Here the assembly of the thinner beam ceilings...
Next part follows...
Re: Timbered House under construction
Posted: Tue Sep 23, 2014 4:19 pm
by hotte8487
Re: Timbered House under construction
Posted: Thu Sep 25, 2014 7:50 pm
by hotte8487
I had promised floorboards in the lower and upper hallway. Comes, but first I've made timbered of the rafters. One more time partition wall and the rest as jamb walls.
For the manufacturing of the two floorboards there is not much to say; I've used ledges 20 and 15 x 2 mm. The gap is closing slowly, here images...
The last floorboard is inserted.
View of the lower floor…
Re: Timbered House under construction
Posted: Thu Sep 25, 2014 7:54 pm
by hotte8487
One floor up it continues, first of all till the stair.
Then were the rafters and the frames additionally with wooden rods connected - better safe than sorry.
The toothpicks were cut off and sanded afterwards.
Then came the bricklayers for the first time, for the representation of the already plastered wall I've used a foam board.
And between every now a case of beer against the dust...
How come my craftsman actually on the roof?
Good question, resolution soon...
Re: Timbered House under construction
Posted: Thu Sep 25, 2014 9:59 pm
by ALPHA
Insulation and air con ducts????????????????????????????
ALPHA
Re: Timbered House under construction
Posted: Thu Sep 25, 2014 10:20 pm
by The Tank Man
I have to say this is a pretty amazing build!!!!! The end result will be amazing! Great job keep the pictures comming!

Re: Timbered House under construction
Posted: Fri Sep 26, 2014 5:55 am
by hotte8487
ALPHA wrote:Insulation and air con ducts????????????????????????????
ALPHA
A good idea, but I will not exaggerate...