
While I do not have a starting point image of the current tank. The next tank is a typical setup of Dean's.
Beautiful on the outside, a tad haphazard internally. This is the next Mato Sherman to get similar treatment/upgrading by me.
Yes those are lego/building blocks that hold the lower to the upper... (Not my doing

)

So we'll backtrack a bit. The gutted Mato Sherman with the Clark TK-2x/40 tray installed.
Provisions for mounting dual 25mm fans, but since this was a TK-20, not needed.

The highly technical concept arrangements. Battery pack and HL Speaker are being used as concept place holders while I awaited the actual speaker and Tarr smoker to install. That high-tech popsicle stick being used to determine the switch bridge dimensions and layout.

Finalized locations and installation. I like my routing to be clean as F%^$. Just awaiting some brass tubing and a tube bender for finishing the smoker plumbing.
If I'm going to do it, I'm going to make it well (I hope)...

Finalized lower with 3D printed trays and organizers. (That is a bridge mounted tray for a Clark TK-60 in the background)

The Switch bridge uprights have multiple mounting provisions. They can be epoxied to the hull, screwed down or even held on by 5mm x 3mm magnets.