The complete building receives from in- and outside a coat of construction adhesive; here the upper floor and...
…here the basement floor.
View through both windows…
Also the bottom plate receive a coat of construction adhesive.
By the way were additional insulators produced…
The front side of the house were prepared for the exits of the power cables.
Here a view with roof; meanwhile has this also received a coat of root tar and varnish.
After drying were additional sides of the house with construction adhesive plastered.
A view from the side…
As next were the windows prepared. From polystyrene made windows receive a frame of thin wood stripes.
The stripes receive before mounting a rabbit to hold the window parts.
Thereafter receive the window frames also a coat of root tar and varnish.
Until the next time…
