
Rolling slowly to the launch pad at 1/4 mile an hour

Detail of the crawler, a marvel of modern engineering

A careful balancing act is required for successful roll-out

One of the four giant tractors, with two sets of treads each

Crushed river rock in the wake of the massive treads