As next was the railing on the agenda, once again tinker parts, at least the foot and handrail. For the balusters I used skewers; here's a photo with the wrong scale for the railing - fitting.
Then in the right scale completed the railing rod for rod. In the front area, because where the two clamps sit, is the handrail for the coiled area already mounted.
For today's report end once a few views with inserted stairs.
A bit grinding is still missing, but so it goes already for me.
Then in the right scale completed the railing rod for rod. In the front area, because where the two clamps sit, is the handrail for the coiled area already mounted.
For today's report end once a few views with inserted stairs.
A bit grinding is still missing, but so it goes already for me.
Last edited by hotte8487 on Tue Dec 09, 2014 7:43 pm, edited 1 time in total.
Greeting Hotte
IG-Panzerjäger Berlin
HL Tiger I late (ElMod)
Torro Kingtiger (ElMod)
Tamiya Tiger I early (ElMod)
Tamiya Panther G (ElMod)
The thinking is allowed to all people, but many are spared. (Curt Goetz 1888-1960)
IG-Panzerjäger Berlin
HL Tiger I late (ElMod)
Torro Kingtiger (ElMod)
Tamiya Tiger I early (ElMod)
Tamiya Panther G (ElMod)
The thinking is allowed to all people, but many are spared. (Curt Goetz 1888-1960)
Re: Timbered House under construction
DANG handrails and everything...I hope your plan is to have some of the roof blown off... so the interior can be taken in.... awesome work Tricky
ALPHA
ALPHA
Re: Timbered House under construction
Hi Alpha,ALPHA wrote:DANG handrails and everything...I hope your plan is to have some of the roof blown off... so the interior can be taken in.... awesome work Tricky
ALPHA
exactly so is the plan - stay curious
Greeting Hotte
IG-Panzerjäger Berlin
HL Tiger I late (ElMod)
Torro Kingtiger (ElMod)
Tamiya Tiger I early (ElMod)
Tamiya Panther G (ElMod)
The thinking is allowed to all people, but many are spared. (Curt Goetz 1888-1960)
IG-Panzerjäger Berlin
HL Tiger I late (ElMod)
Torro Kingtiger (ElMod)
Tamiya Tiger I early (ElMod)
Tamiya Panther G (ElMod)
The thinking is allowed to all people, but many are spared. (Curt Goetz 1888-1960)
Re: Timbered House under construction
The framework for the construction of the floor in the upstairs hallway is still open, therewith I'll start today.
Here are the parts already sawed, notched and once loosely put together.
Subsequently then the assembly, simultaneously with the two thick middle rafters; the stairs loosely with in between.
Then the two remaining thick ceiling beams and the corresponding rafters were sawn and mounted. In the interstices 50% I've used slimmer ceiling beams (10 x 5 mm) and rafters.
Here the assembly of the thinner beam ceilings...
Next part follows...
Here are the parts already sawed, notched and once loosely put together.
Subsequently then the assembly, simultaneously with the two thick middle rafters; the stairs loosely with in between.
Then the two remaining thick ceiling beams and the corresponding rafters were sawn and mounted. In the interstices 50% I've used slimmer ceiling beams (10 x 5 mm) and rafters.
Here the assembly of the thinner beam ceilings...
Next part follows...
Last edited by hotte8487 on Fri Dec 12, 2014 10:14 pm, edited 1 time in total.
Greeting Hotte
IG-Panzerjäger Berlin
HL Tiger I late (ElMod)
Torro Kingtiger (ElMod)
Tamiya Tiger I early (ElMod)
Tamiya Panther G (ElMod)
The thinking is allowed to all people, but many are spared. (Curt Goetz 1888-1960)
IG-Panzerjäger Berlin
HL Tiger I late (ElMod)
Torro Kingtiger (ElMod)
Tamiya Tiger I early (ElMod)
Tamiya Panther G (ElMod)
The thinking is allowed to all people, but many are spared. (Curt Goetz 1888-1960)
Re: Timbered House under construction
All ceiling beams are installed, only missing a few rafters and then later as a conclusion the battens for the roof tiles. Whether Mr. roof plumber also comes - I do not know exactly.
Next, I will devote myself once to the two floors (floorboards) in the lower and upper hallway. In parallel, the bricklayer must come and brick lining the walls in the staircase area - then it goes further outdoor...
Next, I will devote myself once to the two floors (floorboards) in the lower and upper hallway. In parallel, the bricklayer must come and brick lining the walls in the staircase area - then it goes further outdoor...
Last edited by hotte8487 on Fri Dec 12, 2014 10:18 pm, edited 1 time in total.
Greeting Hotte
IG-Panzerjäger Berlin
HL Tiger I late (ElMod)
Torro Kingtiger (ElMod)
Tamiya Tiger I early (ElMod)
Tamiya Panther G (ElMod)
The thinking is allowed to all people, but many are spared. (Curt Goetz 1888-1960)
IG-Panzerjäger Berlin
HL Tiger I late (ElMod)
Torro Kingtiger (ElMod)
Tamiya Tiger I early (ElMod)
Tamiya Panther G (ElMod)
The thinking is allowed to all people, but many are spared. (Curt Goetz 1888-1960)
Re: Timbered House under construction
I had promised floorboards in the lower and upper hallway. Comes, but first I've made timbered of the rafters. One more time partition wall and the rest as jamb walls.
For the manufacturing of the two floorboards there is not much to say; I've used ledges 20 and 15 x 2 mm. The gap is closing slowly, here images...
The last floorboard is inserted.
View of the lower floor…
For the manufacturing of the two floorboards there is not much to say; I've used ledges 20 and 15 x 2 mm. The gap is closing slowly, here images...
The last floorboard is inserted.
View of the lower floor…
Greeting Hotte
IG-Panzerjäger Berlin
HL Tiger I late (ElMod)
Torro Kingtiger (ElMod)
Tamiya Tiger I early (ElMod)
Tamiya Panther G (ElMod)
The thinking is allowed to all people, but many are spared. (Curt Goetz 1888-1960)
IG-Panzerjäger Berlin
HL Tiger I late (ElMod)
Torro Kingtiger (ElMod)
Tamiya Tiger I early (ElMod)
Tamiya Panther G (ElMod)
The thinking is allowed to all people, but many are spared. (Curt Goetz 1888-1960)
Re: Timbered House under construction
One floor up it continues, first of all till the stair.
Then were the rafters and the frames additionally with wooden rods connected - better safe than sorry.
The toothpicks were cut off and sanded afterwards.
Then came the bricklayers for the first time, for the representation of the already plastered wall I've used a foam board.
And between every now a case of beer against the dust...
How come my craftsman actually on the roof?
Good question, resolution soon...
Then were the rafters and the frames additionally with wooden rods connected - better safe than sorry.
The toothpicks were cut off and sanded afterwards.
Then came the bricklayers for the first time, for the representation of the already plastered wall I've used a foam board.
And between every now a case of beer against the dust...
How come my craftsman actually on the roof?
Good question, resolution soon...
Greeting Hotte
IG-Panzerjäger Berlin
HL Tiger I late (ElMod)
Torro Kingtiger (ElMod)
Tamiya Tiger I early (ElMod)
Tamiya Panther G (ElMod)
The thinking is allowed to all people, but many are spared. (Curt Goetz 1888-1960)
IG-Panzerjäger Berlin
HL Tiger I late (ElMod)
Torro Kingtiger (ElMod)
Tamiya Tiger I early (ElMod)
Tamiya Panther G (ElMod)
The thinking is allowed to all people, but many are spared. (Curt Goetz 1888-1960)
Re: Timbered House under construction
Insulation and air con ducts????????????????????????????
ALPHA
ALPHA
- The Tank Man
- Staff Sergeant
- Posts: 971
- Joined: Sat Jul 16, 2011 9:06 am
- Location: England UK Bolton Manchester
Re: Timbered House under construction
I have to say this is a pretty amazing build!!!!! The end result will be amazing! Great job keep the pictures comming!
I love the smell of napalm in the morning!
Re: Timbered House under construction
A good idea, but I will not exaggerate...ALPHA wrote:Insulation and air con ducts????????????????????????????
ALPHA
Greeting Hotte
IG-Panzerjäger Berlin
HL Tiger I late (ElMod)
Torro Kingtiger (ElMod)
Tamiya Tiger I early (ElMod)
Tamiya Panther G (ElMod)
The thinking is allowed to all people, but many are spared. (Curt Goetz 1888-1960)
IG-Panzerjäger Berlin
HL Tiger I late (ElMod)
Torro Kingtiger (ElMod)
Tamiya Tiger I early (ElMod)
Tamiya Panther G (ElMod)
The thinking is allowed to all people, but many are spared. (Curt Goetz 1888-1960)