Timbered House under construction

User avatar
hotte8487
Sergeant
Posts: 732
Joined: Thu Aug 04, 2011 6:28 am
Location: Berlin, Germany

Re: Timbered House under construction

Post by hotte8487 »

As next was the railing on the agenda, once again tinker parts, at least the foot and handrail. For the balusters I used skewers; here's a photo with the wrong scale for the railing - fitting.

Image

Then in the right scale completed the railing rod for rod. In the front area, because where the two clamps sit, is the handrail for the coiled area already mounted.

Image

For today's report end once a few views with inserted stairs.

Image

Image

Image

A bit grinding is still missing, but so it goes already for me.
Last edited by hotte8487 on Tue Dec 09, 2014 7:43 pm, edited 1 time in total.
Greeting Hotte

IG-Panzerjäger Berlin

HL Tiger I late (ElMod)
Torro Kingtiger (ElMod)
Tamiya Tiger I early (ElMod)
Tamiya Panther G (ElMod)

The thinking is allowed to all people, but many are spared. (Curt Goetz 1888-1960)
ALPHA
Major-General
Posts: 10963
Joined: Thu Oct 03, 2013 1:06 am

Re: Timbered House under construction

Post by ALPHA »

DANG 8O handrails and everything...I hope your plan is to have some of the roof blown off... so the interior can be taken in.... awesome work Tricky :thumbup:


ALPHA
User avatar
hotte8487
Sergeant
Posts: 732
Joined: Thu Aug 04, 2011 6:28 am
Location: Berlin, Germany

Re: Timbered House under construction

Post by hotte8487 »

ALPHA wrote:DANG 8O handrails and everything...I hope your plan is to have some of the roof blown off... so the interior can be taken in.... awesome work Tricky :thumbup:


ALPHA
Hi Alpha,

exactly so is the plan - stay curious
Greeting Hotte

IG-Panzerjäger Berlin

HL Tiger I late (ElMod)
Torro Kingtiger (ElMod)
Tamiya Tiger I early (ElMod)
Tamiya Panther G (ElMod)

The thinking is allowed to all people, but many are spared. (Curt Goetz 1888-1960)
User avatar
hotte8487
Sergeant
Posts: 732
Joined: Thu Aug 04, 2011 6:28 am
Location: Berlin, Germany

Re: Timbered House under construction

Post by hotte8487 »

The framework for the construction of the floor in the upstairs hallway is still open, therewith I'll start today.

Image

Here are the parts already sawed, notched and once loosely put together.

Image

Subsequently then the assembly, simultaneously with the two thick middle rafters; the stairs loosely with in between.

Image

Image

Then the two remaining thick ceiling beams and the corresponding rafters were sawn and mounted. In the interstices 50% I've used slimmer ceiling beams (10 x 5 mm) and rafters.

Image

Here the assembly of the thinner beam ceilings...

Image

Image

Next part follows...
Last edited by hotte8487 on Fri Dec 12, 2014 10:14 pm, edited 1 time in total.
Greeting Hotte

IG-Panzerjäger Berlin

HL Tiger I late (ElMod)
Torro Kingtiger (ElMod)
Tamiya Tiger I early (ElMod)
Tamiya Panther G (ElMod)

The thinking is allowed to all people, but many are spared. (Curt Goetz 1888-1960)
User avatar
hotte8487
Sergeant
Posts: 732
Joined: Thu Aug 04, 2011 6:28 am
Location: Berlin, Germany

Re: Timbered House under construction

Post by hotte8487 »

All ceiling beams are installed, only missing a few rafters and then later as a conclusion the battens for the roof tiles. Whether Mr. roof plumber also comes - I do not know exactly.

Image

Image

Next, I will devote myself once to the two floors (floorboards) in the lower and upper hallway. In parallel, the bricklayer must come and brick lining the walls in the staircase area - then it goes further outdoor...

Image

Image

Image

Image
Last edited by hotte8487 on Fri Dec 12, 2014 10:18 pm, edited 1 time in total.
Greeting Hotte

IG-Panzerjäger Berlin

HL Tiger I late (ElMod)
Torro Kingtiger (ElMod)
Tamiya Tiger I early (ElMod)
Tamiya Panther G (ElMod)

The thinking is allowed to all people, but many are spared. (Curt Goetz 1888-1960)
User avatar
hotte8487
Sergeant
Posts: 732
Joined: Thu Aug 04, 2011 6:28 am
Location: Berlin, Germany

Re: Timbered House under construction

Post by hotte8487 »

I had promised floorboards in the lower and upper hallway. Comes, but first I've made timbered of the rafters. One more time partition wall and the rest as jamb walls.
pic107.JPG
pic108.JPG
For the manufacturing of the two floorboards there is not much to say; I've used ledges 20 and 15 x 2 mm. The gap is closing slowly, here images...
pic109.JPG
pic110.JPG
pic111.JPG
The last floorboard is inserted.
pic112.JPG
View of the lower floor…
pic113.JPG
Greeting Hotte

IG-Panzerjäger Berlin

HL Tiger I late (ElMod)
Torro Kingtiger (ElMod)
Tamiya Tiger I early (ElMod)
Tamiya Panther G (ElMod)

The thinking is allowed to all people, but many are spared. (Curt Goetz 1888-1960)
User avatar
hotte8487
Sergeant
Posts: 732
Joined: Thu Aug 04, 2011 6:28 am
Location: Berlin, Germany

Re: Timbered House under construction

Post by hotte8487 »

One floor up it continues, first of all till the stair.
pic114.JPG
pic115.JPG
Then were the rafters and the frames additionally with wooden rods connected - better safe than sorry.
pic116.JPG
The toothpicks were cut off and sanded afterwards.
pic117.JPG
pic118.JPG
Then came the bricklayers for the first time, for the representation of the already plastered wall I've used a foam board.
And between every now a case of beer against the dust...
pic119.JPG
pic120.JPG
How come my craftsman actually on the roof?
Good question, resolution soon...
pic121.JPG
Greeting Hotte

IG-Panzerjäger Berlin

HL Tiger I late (ElMod)
Torro Kingtiger (ElMod)
Tamiya Tiger I early (ElMod)
Tamiya Panther G (ElMod)

The thinking is allowed to all people, but many are spared. (Curt Goetz 1888-1960)
ALPHA
Major-General
Posts: 10963
Joined: Thu Oct 03, 2013 1:06 am

Re: Timbered House under construction

Post by ALPHA »

Insulation and air con ducts???????????????????????????? @)
:haha:
ALPHA
User avatar
The Tank Man
Staff Sergeant
Posts: 971
Joined: Sat Jul 16, 2011 9:06 am
Location: England UK Bolton Manchester

Re: Timbered House under construction

Post by The Tank Man »

I have to say this is a pretty amazing build!!!!! The end result will be amazing! Great job keep the pictures comming! :thumbup:
I love the smell of napalm in the morning!
User avatar
hotte8487
Sergeant
Posts: 732
Joined: Thu Aug 04, 2011 6:28 am
Location: Berlin, Germany

Re: Timbered House under construction

Post by hotte8487 »

ALPHA wrote:Insulation and air con ducts???????????????????????????? @)
:haha:
ALPHA
A good idea, but I will not exaggerate...
Greeting Hotte

IG-Panzerjäger Berlin

HL Tiger I late (ElMod)
Torro Kingtiger (ElMod)
Tamiya Tiger I early (ElMod)
Tamiya Panther G (ElMod)

The thinking is allowed to all people, but many are spared. (Curt Goetz 1888-1960)
Post Reply